Evaluation of the Cost Estimation Models: Case Study of Task Manager Application

Full Text (PDF, 461KB), PP.1-7

Views: 0 Downloads: 0

Author(s)

Mohammed Mugahed Al Qmase 1,* M. Rizwan Jameel Qureshi 1

1. Faculty of Computing and Information Technology, King Abdulaziz University, Saudi Arabia

* Corresponding author.

DOI: https://doi.org/10.5815/ijmecs.2013.08.01

Received: 10 Apr. 2013 / Revised: 23 May 2013 / Accepted: 2 Jul. 2013 / Published: 8 Aug. 2013

Index Terms

COCOMO I, COCOMO II, Software Cost Estimation, Case Study, Sizing Methods

Abstract

The need to accurately estimate time and cost for effective planning of software projects is becoming crucial driven by the escalating demands of the software market. Several models proposed in the history of Software Engineering discipline to estimate time, costs associated with planning and managing software projects as Line of Code (LOC), Function Point (FP) and Constructive Cost Model (COCOMO). This paper focuses upon the COCOMO Model. It is further consisted of its two sub models called COCOMO I and COCOMO II. The primary objective of this research is to use an appropriate case study to evaluate the accuracy of the sub models COCOMO I and II and ascertain the variation of the realistic resource effort, staff and time. The findings to date show that the Application Composition Model of COCOMO II is more accurate in determining time and cost for the successful conclusion of a software project than the other two COCOMO I and II Models for a similar application for example Task Manager.

Cite This Paper

Mohammed Mugahed Al_Qmase, M. Rizwan Jameel Qureshi, "Evaluation of the Cost Estimation Models: Case Study of Task Manager Application", International Journal of Modern Education and Computer Science (IJMECS), vol.5, no.8, pp.1-7, 2013. DOI:10.5815/ijmecs.2013.08.01

Reference

[1]Boehm, B. W. and R. Valerdi. Achievements and Challenges in Cocomo-Based Software Resource Estimation published by IEEE Computer Society. 74-83 (2008).
[2]Boehm, B. W. An Overview of the COCOMO 2.0 Software Cost Model (1999).
[3]Zaid, A., M. H. Selamat, A. A. A. Ghani, R. Atan and K. T. Wei. Issues in Software Cost Estimation, IJCSNS Int J of Computer Science and Network Security, 8(11): 350-356 (2008).
[4]Nasir, M. A Survey of Software Estimation Techniques and Project Planning Practices, Proceedings of the Seventh ACIS Int. Conf. on Software Engineering, Artificial Intelligence, Networking, and Parallel/Distributed Computing (SNPD’06), (2006).
[5]Qureshi, M. R. J. and S. A. Hussain. A Reusable Software Component-Based Development Process Model Int. J of Advances in Engineering Software, 39(2): 88-94 (2008).
[6]Succi, G. and F. Baruchelli. The Cost of Standardizing Components for Software Reuse, Standard View 5(2) (1997).
[7]Gill, N. S. Reusability Issues in Component-Based Development, ACM SIGSOFT Software Engineering Notes, 28(4): 4 – 4 (2003).
[8]Clemente, P. J. and J. Hernández. Aspect Component Based Software Engineering, University Extremadura. 1-4 Spain (2001).
[9]Frakes, W. B. and K. Kang. Software Reuse Research: Status and Future, IEEE Transactions on Software Engineering, 31(7): 529-536 (2005).
[10]Dolado, J. J. A Validation of the Component-Based Method for Software Size Estimation, IEEE Transactions on Software Engineering, 26(10): 1006-1021 (2000).